Bentley University: Boylston Apartments Renovations

Waltham, MA - Knollmeyer Building and Greylock Roofing are working on their third dormitory renovation in 2013 after performing roof replacement of Forest Hall in 2011 and Kresge Hall in 2012. Primary scope for KBC includes carpentry, sheet metal, and asphalt shingle replacement. Tishman is the general contractor, Blackstone Block Architects is the architect, and Simpson, Gumpertz, & Heger is the engineer.


Boylston A Building at Bentley University Before Renovations


Aerial image of Boylston Apartments at Bentley University

Commonwealth Avenue Facade Restoration

Boston, MA - Knollmeyer is performing facade restoration to a historical condominium building on Commonwealth Avenue that was experiencing water infiltration and deterioration. Scope includes mansard waterproofing using Kemperol 2K-PUR fleece-reinforced and liquid-applied waterproofing system; bay window EPDM roof replacement; masonry crack repairs; window painting; dormer sealant replacement; juliet balcony repairs, precast lintel replacement and header/sill repairs; and cornice stone investigation. Simpson, Gumpertz, & Heger is the consulting engineer, and Aberjona Engineering is the structural engineer for the cornice stone investigation shoring.


Commonwealth Avenue Building Scaffolded for Facade Restoration


Phases of Waterproofing Application on Comm Ave Mansard


Finished Kemper 2K-PUR Waterproofing System on Comm Ave Mansard


New EPDM Bay Window Roof and One of Four Repaired Juliet Balconies at Comm Ave


Cornice and Dentil Detail at Comm Ave prior to Structural Investigation

Lynnfield Residential Envelope Repairs

Lynnfield, MA - Knollmeyer Building is working to repair a luxury residential home built just six years ago but facing significant structural and envelope failures. The scope of repairs on the walls include removal and replacement of rotted structural lumber, mold remediation, plywood replacement, installation of WR Grace Perm-A-Barrier VPS (Vapor Permeable Sheet), removal and reflashing of windows, and replacement of existing exterior panel system with Trespa METEON architectual facade panel system. The scope of work on the roof includes replacement of rotted rafters, insulation repairs, new 5/8" plywood decking, installation of VaproShield SlopeShield water resistive roof underlayment, PT wood sleeper system, 3/4" plywood, WR Grace Ultra self-adhered roofing underlayment, and finally new Firestone UNA-CLAD standing seam metal roof system. Simpson Gumpertz & Heger Inc and Gundersen Architects are overseeing the design.


Lynnfield home receiving Trespa rain screen system and new standing seam metal roof


Structural repairs at Lynnfield home


Rear of Lynnfield home receiving Trespa Meteon rain screen system

Park Avenue Congregational Church Roof Repairs

Arlintgon, MA - Teaming up with our sister company, Greylock Roofing, Knollmeyer is replacing a section of EPDM roof and wet insulation and waterproofing the spire cupola using the Kemperol 2K-PUR fleece-reinforced and liquid-applied waterproofing system.


Installation of new fiberboard and EPDM membrane at PACC


Finished EPDM roof section at Park Ave Congregational Church


Inside the spire cupola at PACC after Kemper waterproofing application

Millhaus Apartments Complete Exterior Masonry Restoration

Upton, MA - Knollmeyer Building Corp. is wrapping up the complete restoration of an old hat factory. During the mid 1800’s this complex, of 8 interconnected buildings, was the largest straw hat factory in the world. Abandoned in the 50’s and converted to elderly housing in the 70’s this historically significant structure was in serious need of masonry, carpentry, and roofing repairs. Developed in conjunction with The Architectural Team, the scope of the project includes complete repointing of the brick, and granite façade with a custom made mortar mix designed by project engineers Thompson & Lichtner in concert with the National Park guidelines and manufactured, tinted, and premixed by Quikrete Corp. The wood cornices, crowns, and dentils were reproduced in a millwork shop to their original specifications from African Sapele wood. Slate roofing was removed and replaced with Lamarite 50 year roofing tiles. New copper cornice and roofing materials were manufactured offsite and soldered in place to match the original metal details.




Dormer Repair Before and After at Millhaus


Mansard Repair in Progress and After at Millhaus


Aerial Shot of Millhaus Apartments Complex


Wrapping up the Main Street Elevation of Millhaus Apartments